Wednesday, September 8, 2010

108 Factors Why we Need Telangana

61) WHO declared Nalgonda dist affected with fluorisis so much that it is moving towards No Man Zone.

62) While merging with Andhra leaders agreed to continue Mulki rules in Telangana. As per this 100% employees in Telangana should be from Telangana only.

63) Nizam formulated mulki rules in 1919, a person to get job in they must be Telangana from 15yrs,but now Andhra rulers reduced the period to 4yrs.

64) Seemandhrites got 28000 jobs in Telangana by getting bogus mulki certificates between 1956-1968. Between 1975 to 1985 again 58000 by violating presidential order.

65) In 1969 students/employees agitated against 28000 jobs by Andhra. Andhra rulers killed 370 students.

66) In 1972, Andhra rulers managed to cancel supreme court judgment by parliament, then 6 point formula was introduced for jobs. As per this formula Telangana split into zone 5, zone 6.

67) As per presidential order Telangana people should get reservation 80% dist posts,70% zonal posts, 60% Gazetted posts. Remaining 20%,30%,40% shall be open to other regions – what’s happening now ?

68) In 1985, 610 GO for transfer of 58000 employs from Telangana, but this GO is never implemented. That too 610 GO is restricted to 102 departments only, out of 250 govt departments.

69) In 2001, Chandra Babu Naidu (CM) appointed Girglani Commission which submitted report in 2004, that 2 lakh Seemandhra employs are working in Telangana.

70) Only 23% Singareni coal is used in Telangana. Remaining 77% is being drained out to other places.

71) Per Capita Funds allocation to Student in universities.
SV University - Rs. 37500, Andhra University - Rs 35500
SK University - Rs 25000, Nagarjuna University - Rs 22700
OU - Rs 17400, K.U - Rs 14000

72) Cultivation land (Lakh Acres) Before 1956, Andhra 30.65, Telangana 18.20 In 2004, Andhra 69.27, Telangana 18.00

73) Andhrites love for Hyd is like Pakistan’s love for Kashmir. They are ready to go to any extent to capture it.

74) Kothagudem thermal power station sabotaged on purpose to obtain repair contracts to Andhra contractors in 1978, this is confirmed in single man commission (Sundar Ramaiah commission – 1979)

75) All APSEB scams occurred so far at high level in board are targeted towards Telangana power supply and distribution, never to Andhra or Rayalaseema region. Higher officials found guilty by Vimal Lal commission, the recommendation were never implemented.

76) Technically it is possible to develop water grid to benefit Telangana, Rayalaseema and Andhra regions – it would match in comparison with Mississippi river water system (USA), Three Gorges river system (China),Nile river (Aswan dam) Africa and Rhine river system Europe. Similar models were conceived by intellectuals but are trashed by Andhra rulers and pseudo intellectuals because they will benefit Telangana.

77) 1969 - after Jai Telangana movement 'All Party Accord' was formulated, scrapped within 6 months. Than 8-point formula, 5-point formula were announced. then supreme court upheld Mulki rules. Andhra elites could not digest it, launched Jai Andhra movement. Central govt yielded as usual to elites tactics, then 6-point formula. Even this is being violated royally many times, robbing Telangana its rightfulness.

78) Nagarjuna Sagar initially meant to benefit Andhra and Telangana. Later on it is modified in such a way that 75% of the benefit is accruing to Andhra reducing the share of Telangana region to just 25%. Andhra settlers own 50% of these 25% utilization lands.

79) Singur project was originally designed to meet primarily the irrigation needs of Medak and Nizamabad districts. But it is now solely used for meeting the requirements of capital city.

80) Jurala Project which is the first project on river Krishna meant for Telangana, is the smallest of all the projects built on this river. The Bachawat Tribunal allocated just 17.5 TMC ft. water for this project, and the state government reduced its storage capacity to 60% ft. But the actual utilization so far has not been more than 10%

81) Rajolibanda Diversion Scheme, was to irrigate 87500 acres in Mahabubnagar. The Bachawat Tribunal also allocated 15.90 TMC ft. of water for this project. This water has to pass through a canal in Raichur district of Karnataka State. After the formation of Andhra Pradesh landlords of Rayalaseema blasted the gates with bombs and diverted water to their land. Since then Govt never even tried to reconstruct the gates.

82) Devadula Project, provides water for 5 lakh acres, was promised to be finished in 5 yrs in 2001, yet to begin work. The funniest fact is, Sriram sagar is yet to be completed for last 40 yrs which provides water for just 4 lakh acres. Telangana people are supposed to believe the promise.

83) Two major projects proposed on river Godavari are Ichampally and Polavaram. Ichampally is meant for Telangana and Polavaram for Andhra.The irrigation potential of Polavaram Project would be 6 to 7 times more than the irrigation potential of Ichampally. Ichampally is going to be primarily a power project not a irrigation project

84) Andhra lands are irrigated by canal irrigation i.e. with tax payer’s money. Andhra farmer pays Rs 200 - 300 per annum as water charges. Telangana lands are irrigated by bore wells, entire cost is on the farmer . Digging, power, bore well, motor, pipes. He struggles with fluctuations in power supplies with irregularities and pathetic power distribution pattern in Telangana.

No comments:

Post a Comment